{"id":"how-do-i-switch-from-agencyzoom-to-another-crm","slug":"how-do-i-switch-from-agencyzoom-to-another-crm","title":"How Do I Switch From AgencyZoom to Another CRM? (Step-by-Step)","excerpt":"Switching from AgencyZoom takes 7–14 days with a structured cutover plan: export data, map fields, import to the new CRM, parallel-run for a week, then cut over.","content":"**Quick answer:** To switch from AgencyZoom, export your contacts, policies, tasks, and notes via the AgencyZoom export tool, map fields to your new CRM's schema, import in batches, parallel-run both systems for 5–7 days to verify data integrity, then cut over and cancel AgencyZoom. Most agencies complete the migration in 7–14 days.\n\n## The 7-Step Migration Plan\n\n### Day 1–2: Export\n- Export contacts CSV from AgencyZoom\n- Export policies CSV\n- Export tasks and notes\n- Export pipelines and stages\n- Download attached documents\n\n### Day 3: Field Mapping\nMap AgencyZoom fields to the new CRM's schema. Common gotchas: custom fields, pipeline stage names, agent assignments.\n\n### Day 4–5: Import in Batches\nImport contacts first, then policies linked to contacts, then tasks and notes. Verify counts after each batch.\n\n### Day 6–10: Parallel Run\nKeep AgencyZoom active but log all new activity in the new CRM. Compare daily for discrepancies.\n\n### Day 11–12: Reconnect Carrier Feeds\nLink each appointed carrier to the new CRM and verify commission feeds flow correctly.\n\n### Day 13: Train Producers\nQuick 60-minute training session on the new CRM's pipelines, automation, and AI features.\n\n### Day 14: Cut Over\nDisable AgencyZoom write access, point all integrations to the new CRM, cancel the AgencyZoom subscription.\n\n## Common Pitfalls\n\n- **Skipping field mapping** → orphaned data in the new CRM\n- **Not reconnecting carrier feeds first** → commission data gaps\n- **No parallel-run period** → undiscovered data issues post-cutover\n\n## Bottom Line\n\nA structured 14-day migration from AgencyZoom is straightforward with the right plan. unLocked CRM ships with an AgencyZoom-specific import tool and migration support included.","category":"Voice Search","featureLink":"/blog/how-to-migrate-from-agencyzoom-radius-nowcerts","date":"2026-04-16","readTime":"5 min read","author":"Jacob Lock","cluster":"voice-search","tldr":"To switch from AgencyZoom, export your contacts, policies, tasks, and notes via the AgencyZoom export tool, map fields to your new CRM's schema, import in batches, parallel-run both systems for 5–7 days to verify data integrity, then cut over and cancel AgencyZoom. Most agencies complete the migration in 7–14 days.","keyTakeaways":["Total migration time: 7–14 days with structured plan","Export contacts, policies, tasks, notes, pipelines, documents","Map fields carefully to avoid orphaned data","Parallel-run both systems 5–7 days before cutover","Reconnect carrier feeds before cancelling AgencyZoom"],"faqs":[{"q":"How long does it take to switch from AgencyZoom?","a":"7–14 days with a structured cutover plan."},{"q":"Will I lose data?","a":"No, if you follow proper export and field mapping. Always parallel-run for 5–7 days to catch issues."},{"q":"Do I need to reconnect carrier feeds?","a":"Yes — each appointed carrier must be linked to the new CRM and verified before cutover."}],"howToSteps":[{"name":"Day 1–2: Export","text":"Export contacts CSV, policies CSV, tasks and notes, pipelines and stages, and download attached documents from AgencyZoom."},{"name":"Day 3: Field Mapping","text":"Map AgencyZoom fields to the new CRM's schema. Common gotchas: custom fields, pipeline stage names, agent assignments."},{"name":"Day 4–5: Import in Batches","text":"Import contacts first, then policies linked to contacts, then tasks and notes. Verify counts after each batch."},{"name":"Day 6–10: Parallel Run","text":"Keep AgencyZoom active but log all new activity in the new CRM. Compare daily for discrepancies."},{"name":"Day 11–12: Reconnect Carrier Feeds","text":"Link each appointed carrier to the new CRM and verify commission feeds flow correctly."},{"name":"Day 13: Train Producers","text":"Quick 60-minute training session on the new CRM's pipelines, automation, and AI features."},{"name":"Day 14: Cut Over","text":"Disable AgencyZoom write access, point all integrations to the new CRM, cancel the AgencyZoom subscription."}]}